Skip to content
Message us

ServiceTrabzon

Turnkey home renovation in Trabzon

We renovate your home with a single point of contact: strip-out, electrics and plumbing, underfloor heating, plaster and paint, parquet and tiling, bathrooms and kitchens. Turnkey jobs take 25 to 30 days on average; we confirm the exact schedule after the site visit, based on the scope of work.

Vadikent 4. Etap bathroom: black-framed shower enclosure and patterned tiles.
Photo · Vadikent 4. Etap

01Scope

What's included

  • Strip-out and debris removal
  • Electrics and plumbing
  • Underfloor heating
  • Plaster, skim coat, interior and exterior paint
  • Parquet and tiling
  • Bathroom renovation
  • Suspended ceilings and concealed lighting
  • Kitchens and cabinetry

02Process

How we work

  1. 01

    Site visit

    We measure on site and listen to what you want. You can also send photos and measurements on WhatsApp in advance.

  2. 02

    3D design and materials

    We look at the space together in 3D before any work begins, and choose colours and materials with you.

  3. 03

    Build

    Strip-out, building services, surfaces and furniture move ahead with one team and one point of contact.

  4. 04

    Handover

    Turnkey jobs take 25 to 30 days on average.

03From our work

Examples we have built

All work →
  • Black-framed shower enclosure and patterned wall tiles.
    BuiltVadikent 4. Etap · BathroomVanity top: Lamar porcelain · Doors: Lacquer · WC: Bocchi wall-hung WC
  • Grey-tiled bathroom, glass shower enclosure and white cabinet.
    Builtİnci Evleri · BathroomVanity top: Acrylic · Tiles: Bien · WC: Bocchi wall-hung WC
  • Carved-frame mirror and a cream lacquered vanity.
    BuiltBathroom projectYear: 2021

NewTransform your room

Want to see it first?

Upload a photo of your room and pick a style; see an illustrative preview of the refreshed room in seconds.

Transform your room

04FAQ

Common questions

All questions →
How long does a turnkey renovation take?

Venart's turnkey jobs take 25 to 30 days on average. The exact schedule is set after the site visit, based on the scope of work.

Do you install underfloor heating?

Yes. We install underfloor heating together with the electrical and plumbing work.

How does the site visit work?

Message us on WhatsApp or call, and we will set a day to visit. You can also send photos and measurements of your home on WhatsApp beforehand. Our showroom is in Çukurçayır, at İpekyolu Caddesi 9J/A.